Site preparation guide

What to prepare before a prefab building arrives

Site preparation begins with information. Before delivery is arranged, the people involved need a shared understanding of where the building will go, how it will reach that position and what must be ready around it.

Map the route to the final position

Review the journey from the site entrance to the installation area. Note gate widths, bends, slopes, overhead restrictions and surfaces that could affect the delivery vehicle or handling equipment. Photographs and a simple marked-up plan can help explain conditions that a street address alone cannot show.

Obtain the required ground and support advice

The building format does not define a suitable foundation by itself. Ground conditions, support points, anchoring and local requirements need to be assessed for the actual site and model. Ask the appropriate project professional what information is required, and coordinate the agreed support design with the building specification.

Locate the service connections

Identify how power, water, wastewater and any required communications will reach the building. The positions and responsibilities for these connections should be agreed before installation. Allow for access to valves, panels and other items that will need maintenance.

  • Available services and connection points
  • Work that must be completed before delivery
  • Qualified people responsible for regulated connections
  • Inspection or commissioning requirements

Plan unloading and working space

The final footprint is only part of the space needed during installation. Deliveries may need an unloading area, lifting or handling access, temporary storage and room for assembly or deployment. Confirm the plan with the people responsible for delivery and installation rather than assuming it will be resolved on arrival.

Use a readiness check before dispatch

Review the site conditions and agreed responsibilities against the delivery plan. Confirm that the installation area is accessible, the necessary equipment and people are arranged and outstanding approvals or preparatory work have been addressed. A written readiness list can help the project team identify unresolved items before they affect the delivery.

QUESTIONS & ANSWERS

Before You Start

Can the factory choose my foundation without site information?

A site-specific support design needs relevant ground, building and local-requirement information. Obtain the appropriate professional input for the destination.

Should utility work wait until the building arrives?

Plan the connection positions and responsibilities in advance. The actual sequence should be coordinated with the installation team and relevant professionals.