Factory capability

Make the required capability specific to the project.

Factory capability is most useful when connected to a particular building. Start with the intended use and configuration, then identify the materials, processes, documentation and destination requirements that need to be addressed.

Configuration and building system

Review the requested room arrangement, openings, finishes and service provisions against the proposed system. A change should be considered for its effect on the complete building rather than treated as an isolated feature.

Scope and completion level

Establish which components, fittings and work are included in the factory supply. Identify what will remain for the destination team and what information they will need.

  • Selected structure and enclosure
  • Requested fixtures and finishes
  • Factory-supplied items and destination work
  • Handling, assembly and connection requirements

Information for the actual order

Ask which drawings, material information, inspection records or applicable product documents can be provided for the configuration. A statement about a product family should not be used as a substitute for information covering the selected model.

QUESTIONS & ANSWERS

Before You Start

Can I request technical documents?

Yes. Describe the documents required by your project team or destination authority so availability and applicability can be reviewed.

How do I check a product against my project requirements?

Share the technical criteria identified by your project team and ask which product information addresses them. Confirm the relevant scope and documents before ordering.

YOUR NEXT STEP

Turn Your Requirements Into a Project Brief

Send us your intended use, room layout and delivery location.

Discuss Your Project contact@risesft.com