RISESFT
RISESFT installation support

Middle-Fold House Installation

An installation demonstration for a middle-fold container-house structure.

Middle-fold systemsVideo duration: 0:15
Silent visual guide. Pause and replay each installation step.Download this tutorial

When to use this guide

This tutorial covers a middle-fold structure. Confirm the hinge arrangement and supplied installation drawings before using this sequence.

Use the packing list and approved installation drawings supplied for your order to confirm parts, connections and the work sequence.

Before you begin

  1. Prepare the level supports, access and clear working area required by the installation drawings.
  2. Check the parts and tools against your packing list. Match the system and fittings shown in this tutorial to your supplied unit.
  3. Arrange suitable handling equipment and trained installers. Keep services isolated during installation; use qualified trades for electrical and plumbing connections.

Installation documents

Keep the guide for your model alongside the order-specific drawings and packing list.

Need help with your installation?

Send your model, order number and a clear photo of the part or connection. Our team can help you find the guide for your supplied configuration.

Ask on WhatsApp